| Sl. No. |
Tender ID |
e-Publish Date |
Closing Date |
Title and Ref. No. |
Name of the Office |
|
|
101 |
185694 |
26.12.2025 |
12.01.2026 |
TTPS – Mech.II – AHP – Replacing the Clinker grinder, Feed gate assembly, Power cylinders and its connected pipe lines, Feed sump, Hydraulic
CE/TTPS/SE/M.II/No.357/2025-2026 |
Superintending Engineer/ Mech.II/ TTPS / Tuticorin-4. |
|
102 |
185683 |
26.12.2025 |
12.01.2026 |
TTPS – Mech.II - BM – Unit I - Cleaning of I & II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris
CE/TTPS/SE/M.II/No.48 /2026-2027 |
Superintending Engineer/ Mech.II/ TTPS / Tuticorin-4. |
|
103 |
185684 |
26.12.2025 |
12.01.2026 |
TTPS – Mech.II - BM – Unit II - Cleaning of I & II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris
CE/TTPS/SE/M.II/No.49/2026-2027 |
Superintending Engineer/ Mech.II/ TTPS / Tuticorin-4. |
|
104 |
185685 |
26.12.2025 |
12.01.2026 |
TTPS – Mech.II - BM – Unit I, II & III - Attending Breakdown works in HP valves, actuators, safety valves, WB, LRSB, PRDS etc in Unit I, II
CE/TTPS/SE/M.II/No.50/2026-2027 |
Superintending Engineer/ Mech.II/ TTPS / Tuticorin-4. |
|
105 |
185686 |
26.12.2025 |
12.01.2026 |
TTPS – Mech.II - BM – Unit I to V - Monitoring of water wall soot blowers and Long retractable soot blowers during daily operation in Unit I
CE/TTPS/SE/M.II/No.51/2026-2027 |
Superintending Engineer/ Mech.II/ TTPS / Tuticorin-4. |
|
|