| Complete Details of the Selected Tender
|
|
| | BACK |
| TenderID |
186002 |
| Reference No |
CE SE M II MTPS I O AHS OT 59 2025 2026 |
| Title |
MTPS I O AHS Wet Ash Providing bund wall for separation between Primary Pond I and Primary Pond II |
| Category |
Miscellaneous |
| EMD |
22900 |
| Document Cost |
TN: 0 Other States: 0 Postal Charges: 0 |
| Tender Document |
Download the Tender Document
Note:Document before 25/08/2022 - download from NIC portal |
| AnnxI Document |
None |
| AnnxII Document |
None |
| Publication on Portal |
23-01-2026 |
| LastDate of Document Downloading / Sale |
6-02-2026 14:00 |
| LastDate for Submission |
6-02-2026 14:00 |
| Opening Date & Time |
7-02-2026 14:30 |
| Bid Qualification |
1. The bidder should have previously executed any civil work in Ash dyke area in a single order value of more than Rs.5.73 Lakhs within the past ten years as on the date of tender opening in any Public Sector Undertaking / State Electricity Boards / any Thermal power station of Government organizations (State or Central) in India and should have satisfactory performance for a minimum period of one year as on the date of tender opening. The date of work order will be reckoned for ascertaining the eligibility of the tender. The bidder shall upload scanned original / copy of the work order in complete shape for the above during e-tender.
2. The bidder shall scan & upload End user’s certificate for the satisfactory performance for the above. In case the above work was carried out in TNEB (TANGEDCO /TANTRANSCO / TNPGCL/ Joint venture of TANGEDCO), the End user Certificate will be obtained by the tender inviting Authority directly from the Organizations concerned. However in case of othe |
| Workdescription |
MTPS-I– M-II- O&AHS- Wet Ash – Providing bund wall for separation between Primary Pond I and Primary Pond-II using available ash and rough stones at worksite - Strengthening the boundary bund in the Primary Pond-II- Closing/Opening operations of the shaft vent hole of Primary Pond- I & II, LAD, Secondary pond by fixing MS sheet with respect to water level in pond - Removal and transportation of accumulated ash from Trenches from Railway sliding area to western compound wall and from ESP-IV to western compound wall via fuel Oil Pump House by using earth moving machineries / vehicles as directed by Engineer-in-charge. |
| Pre-Bid Meeting |
None |
| Corrigendum |
Corrigendum Available |